Plumber Baxter: Station Crescent New Toilet

At orbit plumbing we take a lot of pride in our work, so when we got a call asking to install a new toilet and sewer line we were more then happy to take on the challenge.

On first contact with the client we discovered they had built a wall that the toilet was going to back onto, on top of a new timber floor. Taking this into account the plumbers put drop sheets down from the entrance to the area they would be working. Every time the Plumbers entered the house they always took their boots of to help minimize mess and damage to the floor. Even though they had drop sheets the plumbers new that if they got a stone or or piece of metal stuck in their boot it could still possibly scratch the timber floors.

Our plumbers then proceeded to measure the room to make sure they were central of the room and the correct distance off the wall. When the toilet waste hole had been carefully drilled they began to run the sewer line connecting it to the main house line that was 6 meters away from the toilet.

Once the toilet waste and water was ready the plumbers waited for the plastering to be done so they could install the toilet. On completion of the job the plumbers left the job in a clean state and made sure the customer was happy with the end result completed.

Baxter Plumbers Station Crescent New Toilet Install BeforeBaxter Plumbers Station Crescent New Toilet Install After